Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
950*950mm industrial fill material cooling tower pvc fills
The function of the filler in the cooling tower is to increase the heat dissipation, extend the residence time of the cooling water, increase the heat exchange area, and increase the heat exchange. Distribute water evenly. It is not to fill the tower with something that needs to be cooled. A cooling tower is a device that cools the hot fluid (including water) to a reasonable temperature. The waste heat generated in industrial production or refrigeration process is generally conducted away with cooling water. The role of the cooling tower is to carry out heat exchange between the cooling water entraining waste heat and the air in the tower, so that the waste heat is transferred to the air and dispersed into the atmosphere. Cooling tower application range: air conditioning cooling system, refrigeration series, electric furnace, injection molding, tanning, power generation, steam turbine, aluminum profile processing, air compressor, industrial water cooling and other fields.
Name: | Natural Ventilation Cooling Tower Fill |
Type: | Cooling Tower Parts |
Unit: | PC |
Material: | PVC,PP |
Dimension | 950*950mm |
Thickness | usually be 0.25mm,0.38mm,also can be customized |
Usage: | For cooling tower |
color | clear black green blue |
Shaping mode | Plastic extrusion mould |
Brand Name: | Sinta |
Place of origin: | Hebei,China |
Minimum Order: | 1000 PCS |
Packaging Details: | In bundle,wooden pallet or as your request |
Terms of payment: | T/T |
Sample delivery time: | 5-10 days |
Supply Ability: | 200000 sets/month |
Production date: | Within 20days after deposit |
Light weight, high strength
Good fire resistant, Ventilation resistance small
Anti-corrosive, long service time
Large contact area and strong wetting ability
Usage of cooling tower fill
The following is our workshop, we have stock of fill sheets, so we can offer fast delivery.
Packaging & Shipping
Cooling tower fill material
Delivery time:within 5-15days after deposit
Package:pallet,wooden box
Our company info:
Other cooling tower parts you may need:
FAQ
1.Q: Are you Trading Company or Factory:
A:. We are Trading Company and also Factory
2.Q: What's your production ability for one month?
A:We can product Metric Tons per Month 200000 pcs .
3.Q: What's your MOQ?
A:500pcs
4.Q:What's your shipping port?
A:Tianjin,shanghai or any port as your reqirement
5.Q: What's your Payment Terms?
A:L/C,T/T,Western Union
Trial order is acceptable. Sample is available.
Welcome to inquire our Water cooling tower pvc fill material, we will feedback within 24 hours.