• Cooling Tower Cross Flow Replacement Film Fill
  • Cooling Tower Cross Flow Replacement Film Fill
  • Cooling Tower Cross Flow Replacement Film Fill
  • Cooling Tower Cross Flow Replacement Film Fill
  • Cooling Tower Cross Flow Replacement Film Fill
  • Cooling Tower Cross Flow Replacement Film Fill

Cooling Tower Cross Flow Replacement Film Fill

Cooling Method: Cross Flow
Ventilation Mode: Natural Ventilation
Material: PVC/PP
Air Contact Form: Dry
Air Contact Way: Open
Tower Shape: Square
Samples:
US$ 10/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2017

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
LTFIll
Noise Level
Low
Application Fields
Industrial
Certification
RoHS
Condition
New
Color
Carbon Black, etc
Thickness
0.27mm-0.4mm
Length Weight
0.45kg
OEM
OEM
Shaping Mode
Plastic Extrusion Mould
Width
2FT,3FT, 4FT, 5FT
Sheet Space
19mm
MOQ
50PCS
Transport Package
in Bundle,Wooden Pallet/by Air,DHL,by Sea,by Train
Specification
915mm*886mm
Trademark
longtime
Origin
Hebei
HS Code
3926909090
Production Capacity
100000 PCS/Month

Product Description

Key Features of  Cooling Tower Cross Flow Replacement Film Fill
Cooling Tower Cross Flow Replacement Film Fill


1. Greater cooling capacity in a given space
2.Low-clog designs available
3.Available in bottom supported or hanging designs
4. Integral louvers and eliminators available in crossflow 
5.High-temperature designs availableigle-piece, full-height counterflow designs available 


Cooling Tower Cross Flow Replacement Film Fill data 

Cooling Tower Cross Flow Replacement Film Fill
 
Name Cooling Tower Cross Flow Replacement Film Fill
  Cross Flow Cooling Tower PVC Filler
Material PVC PP
Size 915mm 1220mm 1520mm*any*0.25mm-0.38mm(W*L*T)
Profile Height 19mm
Inclination
Temperature suitable 65ºC~ -35 ºC

Main Features
Light weight, high strength
Good fire resistant, Ventilation resistance small
Anti-corrosive, long service time
Large contact area and strong wetting ability

Usage of cooling tower material

Cooling Tower Cross Flow Replacement Film Fill
 

Packaging & Shipping of  cooling tower filler

Cooling tower material

Delivery time:within 5-15days after deposit

Package:pallet,wooden box


Cooling Tower Cross Flow Replacement Film Fill

 

Our company supply various types of cooling tower fill as the following photo shows:


Cooling Tower Cross Flow Replacement Film Fill
 

Cooling tower fill Factory production pictures


Cooling Tower Cross Flow Replacement Film Fill


FAQ
 1.Q: Are you Trading Company or Factory:
   A:.  We are Trading Company and also Factory
 2.Q: What's your production ability for one month?
   A:We can product Metric Tons per Month 200000 pcs  .
 3.Q:  What's your MOQ?
   A:500pcs
 4.Q:What's your shipping port?
   A:Tianjin,shanghai or any port as your reqirement 
 5.Q: What's your Payment Terms?
   A:L/C,T/T,Western Union  
Try order is acceptable. Sample is available.
Welcome to inquire, we will feedback within  24 hours.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now