• Black Color Drift Eliminator for Cooling Tower Fill
  • Black Color Drift Eliminator for Cooling Tower Fill
  • Black Color Drift Eliminator for Cooling Tower Fill
  • Black Color Drift Eliminator for Cooling Tower Fill
  • Black Color Drift Eliminator for Cooling Tower Fill
  • Black Color Drift Eliminator for Cooling Tower Fill

Black Color Drift Eliminator for Cooling Tower Fill

Cooling Method: Cross Flow
Ventilation Mode: Natural Ventilation
Material: PVC ,PP, PVC,PP
Air Contact Form: Wet
Air Contact Way: Open
Tower Shape: Square
Samples:
US$ 20/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2017

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
LTdrift
Noise Level
Low
Application Fields
Industrial
Condition
New
Color
Black White Blue Green
Thickness
Width145mm
Length Weight
Random
OEM
OEM
Shaping Mode
Plastic Extrusion Mould
Application
Cooling Tower
Name
Drift Eliminator
Usage
Cooling Tower
Hole Shape
Irregular
Shape
Customers′ Request
Technique
Punching
Filter Rating
99%
Thickness Range
0.8-1.0 mm
Materials
PVC
Transport Package
in Bundle,Wooden Pallet/by Air,DHL,by Sea,by Train
Specification
145mm
Trademark
langtime
Origin
Hebei
HS Code
3926909090
Production Capacity
100000 Sets/Month

Product Description

Product Description


 drift eliminator for cooling tower

Cooling tower drift eliminator are used to control water loss from a cooling tower by limiting the amount of circulating water droplets that are emitted with the exhaust air of the tower. Since drift droplets contain the same chemical and particulate matter of the circulating water from which they originate, they can cause numerous detrimental effects on surrounding equipment and the environment. The cooling tower industry uses drift rate to compare drift eliminator performance, a relationship that correlates droplet capture efficiency to the water circulation rate in a tower. drift eliminators are specifically designed to achieve maximum drift removal efficiency in both crossflow and counterflow tower applications with various product options available to minimize pressure drop, drift loss, cost, or a combination of all three

Black Color Drift Eliminator for Cooling Tower Fill

 Cooling tower drift eliminator guarantee:
1. maximum operational safety;
2. legal compliance;
3. original therml performance of your BAC cooling equipment;
4. easy cleaning;
5. dry surronding by minimum drift emission

 

PVC Cooling tower drift eliminator material physical and mechanical properties:
 

No.  Item  Unit  Index Test Method 
 1  Density  g/cm3  ≤1.6  GB/T 1033
 2  Dimensional stability  %  ≤5  
 3  Tensile strength   Mpa  ≥45  GB/T 13022
 4  Elongation at break  %  ≥40  GB/T 13022
 5  Izod impact strength  102KJ/m  before aging≥45,
 after aging  ≥36
 GB/T 1843
 6  Vicat softening point  ºC  ≥82  GB/T 1633
 7  Oxygen index  %  ≥40  GB/T 2406


Usage of Marley cooling tower drift eliminator

Black Color Drift Eliminator for Cooling Tower Fill


Feature of Water drift eliminator:

1). Its rate of drift is less than 0.001% of the circulating water flow rate, which is merely one fifth of the allowance value stipulated in GB7190.2-2008.The lower rate of drift helps to prolong the service life of fan due to decrease contact between the fan blade and the moist air, and helps to decrease the usage of chemical.

2). Lower rater of drift helps to reduce the impact to the boundary environment.

3). Its resistance is about 0.8mmH2O at 2.8m/s air velocity. Low resistance decreases the power consumption of fan, and reduces the cost.

4). Made of advanced PVC with additive to improve the performance of resistance ageing and anti-ultraviolet, its design life is 20 years.

5). Assembly with plug-in method increases rigidity and makes the assembly easier.


Why choose us              
 
1. Competitive price
With many years experience in this filed, we can give competitive price. As a manufacturer, we sale products directly there will not have any other cost.
2. Our quality guarantee
We make quality for each process before packing.Avoiding manufacturer defects
3. Fast delivery time 
Adopts advanced equipment and machines to production capacity for bulks,ensure the shipment soon,improve your efficiency.
4. FRP Conduit Snake Duct Rod Packing
Durable wooden pallet or carton, you can be sure the ordered items will reach your in perfect condition.

Black Color Drift Eliminator for Cooling Tower Fill

 

Our service

   We offer professional products and fast delivery.
   We will help you solve problems when you use our products.
   Any question can turn to the technology department of our company.

 

  • Fast delivery  (Our factory has high production capacity and there is enough inventory to insure fast delivery for you)
  • 2. Competitive price (We are manuafacturer of our products, so we can provide you both high quality products and competitive price)
  • Quick response each inquiry within 24hours
  • Quanlity control strickly
  • Quick delivery imporve your effciency


 Packaging & Shipping

Cooling tower drift eliminator

Delivery time:within 5-15days after deposit

Package:pallet,wooden box
 

Black Color Drift Eliminator for Cooling Tower Fill
Black Color Drift Eliminator for Cooling Tower Fill

 

We Langtime supply ever types of EAC cooling tower fill as the following photo shows:

Black Color Drift Eliminator for Cooling Tower Fill


 

FAQ

1.Q: Are you Trading Company or Factory:

   A:.  We are Trading Company and also Factory

 2.Q: What's your production ability for one month?

     A:We can product Metric Tons per Month 200000 pcs  .

 3.Q:  What's your MOQ?

     A:50pcs

 4.Q:What's your shipping port?

    A:Tianjin,shanghai or any port as your reqirement 

 5.Q: What's your Payment Terms?

    A:L/C,T/T,Western Union  

Try order is acceptable. Sample is available.

Welcome to inquire, we will feedback within  24 hours.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now