Customization: | Available |
---|---|
Cooling Method: | Cross Flow |
Ventilation Mode: | Natural Ventilation |
Still deciding? Get samples of US$ 20/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cooling Tower Component PVC Marley Cooling Tower Water Drift Eliminator
Cooling tower drift eliminator are used to control water loss from a cooling tower by limiting the amount of circulating water droplets that are emitted with the exhaust air of the tower. Since drift droplets contain the same chemical and particulate matter of the circulating water from which they originate, they can cause numerous detrimental effects on surrounding equipment and the environment. The cooling tower industry uses drift rate to compare drift eliminator performance, a relationship that correlates droplet capture efficiency to the water circulation rate in a tower. drift eliminators are specifically designed to achieve maximum drift removal efficiency in both crossflow and counterflow tower applications with various product options available to minimize pressure drop, drift loss, cost, or a combination of all three
Cooling tower drift eliminator guarantee:
1. maximum operational safety;
2. legal compliance;
3. original therml performance of your BAC cooling equipment;
4. easy cleaning;
5. dry surronding by minimum drift emission
PVC Cooling tower drift eliminator material physical and mechanical properties:
No. | Item | Unit | Index | Test Method |
1 | Density | g/cm3 | ≤1.6 | GB/T 1033 |
2 | Dimensional stability | % | ≤5 | |
3 | Tensile strength | Mpa | ≥45 | GB/T 13022 |
4 | Elongation at break | % | ≥40 | GB/T 13022 |
5 | Izod impact strength | 102KJ/m | before aging≥45, after aging ≥36 |
GB/T 1843 |
6 | Vicat softening point | ºC | ≥82 | GB/T 1633 |
7 | Oxygen index | % | ≥40 | GB/T 2406 |
Usage of Marley cooling tower drift eliminator
Feature of Water drift eliminator:
1). Its rate of drift is less than 0.001% of the circulating water flow rate, which is merely one fifth of the allowance value stipulated in GB7190.2-2008.The lower rate of drift helps to prolong the service life of fan due to decrease contact between the fan blade and the moist air, and helps to decrease the usage of chemical.
2). Lower rater of drift helps to reduce the impact to the boundary environment.
3). Its resistance is about 0.8mmH2O at 2.8m/s air velocity. Low resistance decreases the power consumption of fan, and reduces the cost.
4). Made of advanced PVC with additive to improve the performance of resistance ageing and anti-ultraviolet, its design life is 20 years.
5). Assembly with plug-in method increases rigidity and makes the assembly easier.
Why choose us
1. Competitive price
With many years experience in this filed, we can give competitive price. As a manufacturer, we sale products directly there will not have any other cost.
2. Our quality guarantee
We make quality for each process before packing.Avoiding manufacturer defects
3. Fast delivery time
Adopts advanced equipment and machines to production capacity for bulks,ensure the shipment soon,improve your efficiency.
4. FRP Conduit Snake Duct Rod Packing
Durable wooden pallet or carton, you can be sure the ordered items will reach your in perfect condition.
Our service
We offer professional products and fast delivery.
We will help you solve problems when you use our products.
Any question can turn to the technology department of our company.
Packaging & Shipping
Cooling tower drift eliminator
Delivery time:within 5-15days after deposit
Package:pallet,wooden box
We Langtime supply ever types of cooling tower fill as the following photo shows:
1.Q: Are you Trading Company or Factory:
A:. We are Trading Company and also Factory
2.Q: What's your production ability for one month?
A:We can product Metric Tons per Month 200000 pcs .
3.Q: What's your MOQ?
A:50pcs
4.Q:What's your shipping port?
A:Tianjin,shanghai or any port as your reqirement
5.Q: What's your Payment Terms?
A:L/C,T/T,Western Union
Try order is acceptable. Sample is available.
Welcome to inquire, we will feedback within 24 hours.