• Cooling Tower 145mm Mist Drift Eliminator
  • Cooling Tower 145mm Mist Drift Eliminator

Cooling Tower 145mm Mist Drift Eliminator

Cooling Method: Cross Flow
Ventilation Mode: Natural Ventilation
Material: PVC ,PP, PVC,PP
Air Contact Form: Wet
Air Contact Way: Open
Tower Shape: Square
Samples:
US$ 20/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2017

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
drift eliminator 31
Noise Level
Low
Application Fields
Industrial
Certification
CSA, UR, ISO, CE, CCC
Condition
New
Color
Black White Blue Green
Thickness
Width145mm
Length Weight
Random
OEM
OEM
Shaping Mode
Plastic Extrusion Mould
Application
Cooling Tower
Name
Marley Drift Eliminator
Transport Package
in Bundle,Wooden Pallet/by Air,DHL,by Sea,by Train
Specification
145mm
Trademark
langtime
Origin
Hebei
HS Code
3926909090
Production Capacity
100000 Sets/Month

Product Description

Cooling Tower Component PVC Marley  Cooling Tower Water Drift Eliminator

Cooling tower drift eliminator are used to control water loss from a cooling tower by limiting the amount of circulating water droplets that are emitted with the exhaust air of the tower. Since drift droplets contain the same chemical and particulate matter of the circulating water from which they originate, they can cause numerous detrimental effects on surrounding equipment and the environment. The cooling tower industry uses drift rate to compare drift eliminator performance, a relationship that correlates droplet capture efficiency to the water circulation rate in a tower. drift eliminators are specifically designed to achieve maximum drift removal efficiency in both crossflow and counterflow tower applications with various product options available to minimize pressure drop, drift loss, cost, or a combination of all three
Cooling Tower 145mm Mist Drift Eliminator

 Cooling tower drift eliminator guarantee:
1. maximum operational safety;
2. legal compliance;
3. original therml performance of your BAC cooling equipment;
4. easy cleaning;
5. dry surronding by minimum drift emission

Usage of Marley cooling tower drift eliminator

Cooling Tower 145mm Mist Drift Eliminator
 

Packaging & Shipping

Cooling tower drift eliminator

Delivery time:within 5-15days after deposit

Package:pallet,wooden box

Cooling Tower 145mm Mist Drift Eliminator

 

We Langtime supply ever types of cooling tower fill as the following photo shows:

Cooling Tower 145mm Mist Drift Eliminator

Factory Show
 
Cooling Tower 145mm Mist Drift Eliminator

FAQ

1.Q: Are you Trading Company or Factory:

   A:.  We are Trading Company and also Factory

 2.Q: What's your production ability for one month?

     A:We can product Metric Tons per Month 200000 pcs  .

 3.Q:  What's your MOQ?

     A:50pcs

 4.Q:What's your shipping port?

    A:Tianjin,shanghai or any port as your reqirement 

 5.Q: What's your Payment Terms?

    A:L/C,T/T,Western Union  

Try order is acceptable. Sample is available.

Welcome to inquire, we will feedback within  24 hours.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now